REBAR MODEL CLASH REPORTS

Solve can take existing reinforcement drawings/schedules and model all of the reinforcement accurately to allow a comprehensive rebar buildability and clash check report to be compiled.

These models and reports help identify:
- rebar clashing with rebar
- rebar clashing with cast in items, temporary props, M&E pipes etc
- buildability issues due to site contraints
- buildability of complex connection detail
- site sequencing and accessibility issues
- concrete flow restrictions