The Pinnacle, London

RC detailing of the foundation package supporting a 60 storey tower structure, including a 25x25x5m deep central pilecap which required 450 tonnes of reinforcement. A total of 725 tonnes detailed in the foundations with all RC detailing completed in 3D.