Woolwich Crossrail station

solve produced all 3D RC details, drawings & models for the prefabricated Diaphragm wall cages at the new £100m Woolwich crossrail station project.

The main contractor decided very early on that due to the size complexity of the cages it was essential that 3D reinforcement detailing was used on this project to ensure minimum disruption during the manufacture and installation of the prefabricated cages each weighing as much as 25 Tonnes.