St Helens & Whiston Hospitals

Over 2900 tonnes of reinforcement detailed by BDC, including pilecaps, pits, in-situ slabs, retaining walls, beams and columns. For the detailing of the slip formed cores we liaised closely with the frame contractor to optimise detailing to improve steel fixing access & speed.